BP STEAM at Refinery Gelsenkirchen-Scholven, Germany
Planning, Construction and Operation of four New High-Pressure Steam Boilers and their Auxiliary Plants
Ruhr Oel GmbH (ROG) is planning a total of 4 new high-pressure steam boilers with a maximum firing heat capacity of 436 MWth at the Gelsenkirchen-Scholven site, with two plants in construction at Field North and two at Field Centre.
STEAG GmbH has been commissioned by ROG as General Contractor (EPC) for the planning, construction, commissioning and subsequent maintenance.
STEAG Energy Services GmbH (SES) is responsible for the technical processing providing the following services:
• General planning
• Detail design
• Technical control of subcontractors
• Site management / construction supervision
• Commissioning management
Project facts
Installed capacity | 2 x 140 t/h (2 x 122 MWth) 2 x 120 t/h (2 x 96 MWth / 15 MWel) |
Technology | Natural circulation boiler |
Fuel | Natural gas / coke gas / refinery gas |
Customer | STEAG GmbH / Ruhr Oel GmbH |
Execution of SES services | 2017 - ongoing |