    Gundremmingen Nuclear Power Plants, Germany

    Intermediate storage cranes according to KTA 3902

    Crane systems must comply with the enhanced requirements of the safety rules of the KTA (Nuclear Safety Standards Commission) 3902 Section 4.3 “Design of Lifting Equipment in Nuclear Power Plants“. STEAG Energy Services (SES) was commissioned to design, commission and install new crane systems. The following services were rendered: detailed and implementation planning including preparation of the preliminary design documents for the machine technology, instrumentation and control technology at the Gundremmigen and Biblis sites, procurement, manufacturing, delivery, assembly, and commissioning of two new crane systems at the Gundremmigen site (Biblis on hold).

    Project facts

    CustomerRWE Power AG
    SitesGrundremmingen / Biblis
    Technologynuclear power plant
    Servicesintermediate storage cranes
    Execution of SES services2011 - ongoing