References
IKW Refinery Salzbergen, Germany
Refurbishment of steam turbine set
STEAG Energy Services GmbH (SES) performed the following services:
• Feasibility study
• Conceptual design
• Integration of generator into electrical grid, Layout planning
• Evaluation of investment
• Technical / economical evaluation
• Preparation of Tender documents
• Bid evaluation
• Permission and licensing engineering
• Owner´s Engineer for execution, Construction supervision
Project facts
New back-pressure turbine | 9 MW |
Replacement of older turbines | 2 |
Integration | Full integration into existing buildings |
Conformity | Compliant with the German Cogeneration Act |
Customer | SRS EcoTherm GmbH |
Execution of SES services | 2009 - 2016 |