References
Construction CCPP INEOS O10, Germany
Owner's Engineer: Power generation plant for hydrogen and hydrogen-rich gases
INEOS is building a combined heat and power plant in Cologne-Worringen. The plant will burn
gaseous and liquid production residues and supply the production facilities with steam (at
various pressure levels) as well as electricity.
STEAG Energy Services GmbH acts as Owner’s Engineer with the following services:
• Feasibility Study
• Conzept Design
• Basic Boiler Design
• Tendering
• Bid Evaluation
• Elaboration of license application
• Design Review
• Engineering Management
• Construction supervision
• Commissioning
Project facts
Gas Turbine / Steam Generator | 25 MW / 240 t/h |
Backpressure steam turbine | 38 MW |
Steam supply | at 60 bar, 30 bar, 15 bar and 5 bar |
Thermal utilization of following residues | HP-, LP-, extractable organic halogen residual gases, H2-gas, hydrocyanic acid, crack oil |
Customer | INEOS Köln GmbH |
Execution of SES services | 12/2013-05/2014 (Feasibility study) 10/2014 (Start of Engineering Services) |