• EN
  • References

    CHP Plant Altbach, Germany

    Expert System SR::BCM optimizes plant efficiency by implementing optimal cleaning strategy of the heating surfaces (soot blowing optimization)

    STEAG Energy Services (SES) implemented the IT based solution SR::BCM, which continuously determines the current fouling of all heating surfaces in the coal-fired unit of the Altbach CHP plant. By providing the optimal point for the cleaning, steam temperature reductions are decreased, plant efficiency is optimized and lower stress of the heating surfaces is achieved in CHP plant Altbach.

    Project facts

    Installed capacity350 MW
    Implemented IT solutionsootblowing management (SR::BCM)
    TechnologyCHP plant
    CustomerEnBW AG
    Execution of SES services2012