References
CHP Plant Altbach, Germany
Expert System SR::BCM optimizes plant efficiency by implementing optimal cleaning strategy of the heating surfaces (soot blowing optimization)
STEAG Energy Services (SES) implemented the IT based solution SR::BCM, which continuously determines the current fouling of all heating surfaces in the coal-fired unit of the Altbach CHP plant. By providing the optimal point for the cleaning, steam temperature reductions are decreased, plant efficiency is optimized and lower stress of the heating surfaces is achieved in CHP plant Altbach.
Project facts
Installed capacity | 350 MW |
Implemented IT solution | sootblowing management (SR::BCM) |
Technology | CHP plant |
Customer | EnBW AG |
Execution of SES services | 2012 |