References
Sivas Compressor Station, Turkey
Concept studies
Study on and selection of optimal configuration and size for the electrical energy generation from the waste heat of a compressor station, concept design, operational duty optimization, engineering economy justifications.
Project facts
Installed capacity | 40 MWel steam turbine |
Fuel | Waste heat of GT compressors |
Customer | SEBAT Ltd. |
Execution of SEES services | 2013 |