ISKEN Power Plant of STEAG, Turkey
Prediction and early detection of critical conditions and process behaviors
At Unit 20 of ISKEN power plant, STEAG Energy Services (SES) implemented the IT solution SR::SPC to reliably detect changes in the operating behavior. Variables to be monitored include thermodynamic performance indicators, vibrations, and vacuum measurements. Thus the operating staff is relieved in the continuous assessment of the actual plant condition. The SR::SPC system allows cost-savings due to plannable maintenance operations and prevention of unplanned shutdowns.
Project facts
Installed capacity | 2 x 604 MW |
Implemented IT solution | Predictive Analytics (SR::SPC) |
Technology | coal-fired power plant |
Customer | İSKEN - SUGÖZÜ ENERJİ SANTRALI |
Execution of SES services | 2014 |