    Power Plant Walsum 10/9, Germany

    Holistic flexibility approach

    Due to the German energy turn-around, the position of hard coal-fired power plants in Germany has changed, namely from rather base-load oriented operation to very flexible mid-load operation. In the STEAG/EVN power plants Walsum unit 10 and the STEAG CHPP unit 9 several optimization measures have been evaluated and implemented such as minimum load reduction to less than 20%, start-up optimization and realization of advanced frequency control using several inherent storage capabilities of the water steam cycle.

    Project facts

    Installed capacity800 MW / 410 MW
    Boiler typeonce through boiler
    CustomerSTEAG GmbH
    Execution of SES services2010 - ongoing