References
UTG Gas Treatment Plant in Parnaiba, Brazil
Owner’s Engineer: UTE Parnaiba – thermal power plant (gas)
STEAG Energy Services do Brasil was hired by ENEVA to perform the following services:
- Owner‘s engineering
- Preparation and validation: design & technical specification
- Support to project management
- Support to the management of the EPC contractor
- Design review
- Quality assurance in the process of construction and assembly
- Commissioning support
Project facts
Installed capacity | 1.4 GW Open cycles: 855 MW Combined cycle: 520 MW |
Commissioning | Open cycle – 2014 Combined cycle – 2015 |
Customer | ENEVA |
Execution of SES services | 2011 – 2016 |